On May 22, 2023, Everson Asphalt Paving started installing four new speed bumps at Capitol City Golf Club Estates. The bumps are designed to match existing ones at Capitol and to meet all prescribed safety standards. The final painting of the bumps is scheduled to be completed on May 30, 2023. The location of the bumps was budgeted in the Association’s 2023 Operating Budget and the result of a year-long traffic study.
—President Larry Dittloff and CapCity’s Streets and Roads Committee
